Global priority critical pathogens-its prevalence and molecular epidemiology in Arar tertiary care hospital, Saudi Arabia

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Ectopic pregnancy. Prevalence and risk factors in women attending a tertiary care hospital in Saudi Arabia.

OBJECTIVES To find the prevalence, risk factors, and pattern of management of ectopic pregnancy (EP). METHODS This retrospective study was conducted between January 2000 and December 2010 in all patients admitted to King Fahd Hospital of University, Al-Khobar, Kingdom of Saudi Arabia. Patients with suspected history of EP were collected. We collected the following data: age, parity, history o...

متن کامل

Prevalence of Resistant Streptococcus Pneumoniae Causing Meningitis in a Tertiary Care Hospital in Saudi Arabia

Acute bacterial meningitis is associated with high rates of morbidity and mortality. Streptococcus pneumoniae is a major cause in adults and children. Choice of empirical antibiotics must be made in consideration of the global increase of resistant strains to penicillin and third-generation cephalosporins. In order to determine the most common pathogens responsible for bacterial meningitis in K...

متن کامل

Critical care service in Saudi Arabia

T Kingdom of Saudi Arabia (KSA), is one of the largest Middle Eastern countries with a landmass of 2.5 million square kilometers, and has transformed over 50 years to the most urbanized country in the region. With an estimated population of almost 30 million residents with an annual growth rate of 2.7%,1 the Saudi Arabian healthcare sector caters to a rapidly growing population and the concurre...

متن کامل

Epidemiology of senile prostatic enlargement among elderly men in Arar, Kingdom of Saudi Arabia

BACKGROUND AND AIM Senile prostatic enlargement due to benign prostatic hyperplasia (BPH) is a common problem among older men, and is responsible for considerable disability. This study was conducted to determine the prevalence and determinants of the clinically diagnosed prostatic enlargement among elderly men in Arar, Northern Saudi Arabia. METHODS This cross-sectional study was carried out...

متن کامل

Prevalence, risk factors and character of abdominal hernia in Arar City, Northern Saudi Arabia in 2017

BACKGROUND Abdominal wall hernias are a very common surgical condition affecting all ages and both sexes. The main risk factors of hernias include pregnancy, weight lifting, constipation, and weight gain. OBJECTIVE The aim of this study was to determine the prevalence and risk factors of abdominal hernias, their causes, treatment and complications among both sexes of the Arar population (Saud...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The Annals of Clinical and Analytical Medicine

سال: 2019

ISSN: 2667-663X

DOI: 10.4328/jcam.6036