Goal Programming Model to Optimize the Amount of Gauze Production

نویسندگان

چکیده

PT KHW is a company engaged in the manufacture of cotton and gauze for health cosmetic purposes. The products produced by sometimes exceed number consumer demands there shortage products. Therefore, good production planning order to meet demand with right amount time needed so increased profits are obtained. This study aims determine optimal production, obtainedby costs that must be incurred company. uses goal programming method optimize determining decision variables, constraint functions target functions.The arranged based on priority level desired priorities considered include thegoal maximizing product sales profits, minimizing costs, use rawmaterials, time, overtime.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Extended Mathematical Programming Model to Optimize the Cable Trench Route of Power Transmission in a Metro Depot

The necessary electricity of the workshops and buildings (W&Bs;) located at the metro depot are provided by lighting power substation (LPS). To transmit electricity between LPS and W&Bs;, some trenches should be dig and the requisite cables should be located in the trenches. This paper presents a new mixed integer linear programming (MILP) long-term decision model to find ...

متن کامل

Adaptive aggregate production planning with fuzzy goal programming approach

Aggregate production planning (APP) determines the optimal production plan for the medium term planning horizon. The purpose of the APP is effective utilization of existing capacities through facing the fluctuations in demand. Recently, fuzzy approaches have been applied for APP focusing on vague nature of cost parameters. Considering the importance of coping with customer demand in different p...

متن کامل

‏‎faciliting lexical access for the fluent production of speech‎‏

‏‎the hypothesis is that recent and frequent exposure to lexical items leads to a more fluent production of speech in terms of rate of speech. to test the hypothesis,a one-way anova experimental design was carried out. 24 sednior students of efl participated in a one-way interview test. data analyses revealed that those who were exposed frequently to the lexical items over a week prior to inter...

15 صفحه اول

Portfolio selection through imprecise Goal Programming model: Integration of the manager`s preferences

In the portfolio selection problem, the manager considers several objectives simultaneously such as the rate of return, the liquidity and the risk of portfolios. These objectives are conflicting and incommensurable. Moreover, the objectives can be imprecise. Generally, the portfolio manager seeks the best combination of the stocks that meets his investment objectives. The imprecise Goal Program...

متن کامل

A Fuzzy Goal Programming Model for Efficient Portfolio Selection.

This paper considers a multi-objective portfolio selection problem imposed by gaining of portfolio, divided yield and risk control in an ambiguous investment environment, in which the return and risk are characterized by probabilistic numbers. Based on the theory of possibility, a new multi-objective portfolio optimization model with gaining of portfolio, divided yield and risk control is propo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International journal of advances in scientific research and engineering

سال: 2023

ISSN: ['2454-8006']

DOI: https://doi.org/10.31695/ijasre.2023.9.6.2