Heuristic algorithms for the unrelated parallel machine scheduling problem with one scarce additional resource

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines

In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...

متن کامل

Heuristic algorithms for a complex parallel machine scheduling problem

In this work we present a new scheduling model for parallel machines, which extends the multiprocessor scheduling problem with release times for minimizing the total tardiness, and also extends the problem of vehicle routing with time windows. This new model is motivated by a resource allocation problem which appears in the service sector. We present two class of heuristic algorithms for the so...

متن کامل

Heuristics for Unrelated Parallel Machine Scheduling with Secondary Resource Constraints

This research deals with the problem of scheduling N jobs on M unrelated parallel machines. Each job has a due date and requires a single operation. A setup that includes detaching one die and attaching another from the appropriate die type is incurred if the type of the job scheduled is different from the last job on that machine. Due to the mechanical structure of machines and the fitness of ...

متن کامل

Unrelated Parallel Machine Scheduling with Resource Dependent Processing Times

We consider unrelated machine scheduling problems with the objective to minimize the schedule makespan. In addition to its machinedependence, the processing time of any job is also dependent on the usage of a scarce renewable resource. An amount of k units of that resource, e.g. workers, can be distributed over the jobs in process, and the more of that resource is allocated to a job, the smalle...

متن کامل

A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Expert Systems with Applications

سال: 2018

ISSN: 0957-4174

DOI: 10.1016/j.eswa.2017.09.054