HEURISTIC FOR BALANCING U-SHAPED ASSEMBLY LINES WITH PARALLEL STATIONS

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Balancing of parallel U-shaped assembly lines

A new hybrid assembly line design, called Parallel U-shaped Assembly Line system, is introduced and characterised along with numerical examples for the first time. Different from existing studies on U-shaped lines, we combine the advantages of two individual line configurations (namely parallel lines and U-shaped lines) and create an opportunity for assigning tasks to multi-line workstations lo...

متن کامل

A New U-Shaped Heuristic for Disassembly Line Balancing Problems

The product recovery operations are fully based on disassembly line balancing. The disassembly line is a best chaise of automated disassembly or returned product. It is very difficult to find the optimal balance of a disassembly line because of its N-P hard nature. In this paper a new U-shaped heuristic is proposed to assign the parts to the disassembly work stations under precedence constraint...

متن کامل

A heuristic approach for U-shaped assembly line balancing to improve labor productivity

The assembly line balancing problem is a non deterministic polynomial type planning problem for mass production. Layout design changes constitute a major decision that yields investment for assembly operations and numerous heuristics have been reported in the literature for solving the line balancing problems. U-shaped assembly layout offers several benefits over traditional straight-line layou...

متن کامل

Balancing parallel assembly lines with disabled workers

In this paper we study an assembly line balancing problem that occurs in sheltered worker centers for the disabled, where workers with very different characteristics are present. We are interested in the situation in which complete parallel assembly lines are allowed and name the resulting problem as parallel assembly line worker assignment and balancing problem (PALWABP). This approach enables...

متن کامل

‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSIS

With the growth in customers’ demand diversification, mixed-model U-lines (MMUL) have acquired increasing importance in the area of assembly systems. There are generally two different approaches in the literature for balancing such systems. Some researchers believe that since the types of models can be very diverse, a balancing approach without simultaneously sequencing of models will not yield...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Operations Research Society of Japan

سال: 2008

ISSN: 0453-4514,2188-8299

DOI: 10.15807/jorsj.51.1