Hybrid ABC-BAT for Solving Short-Term Hydrothermal Scheduling Problems

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving hybrid flow shop scheduling problems using bat algorithm

This paper investigates the multistage hybrid flow shop (HFS) scheduling problems using the new bat algorithm. A HFS is the generalisation of flowshop with multiple machines. HFS is one of the important scheduling problems that represent many industries like iron and steel, chemical, textile and ceramic industries. The HFS scheduling problems have been proved to be NP-hard. A recently developed...

متن کامل

A SIMPLIFIED LAGRANGIAN MULTIPLIER APPROACH FOR FIXED HEAD SHORT-TERM HYDROTHERMAL SCHEDULING

This paper presents a simplifiedlagrangian multiplier based algorithm to solve the fixed head hydrothermalscheduling problem. In fixed head hydrothermal scheduling problem, waterdischarge rate is modeled as quadratic function of hydropower generation andfuel cost is modeled as quadratic function of thermal power generation. Thepower output of each hydro unit varies with the rate of water discha...

متن کامل

Hybrid Constraint Tightening for Solving Hybrid Scheduling Problems

Hybrid Scheduling Problems (HSPs) contain both temporal and finite-domain variables, as well as constraints between them. A hybrid constraint over temporal and finite-domain variables often models situations where different assignments to a subset of finite-domain variables result in different bounds on temporal constraints. The insight we examine in this paper is that some temporal constraint ...

متن کامل

Integrated PSO - SQP technique for Short - term Hydrothermal Scheduling

1423 ISSN: 2278 – 1323 All Rights Reserved © 2015 IJARCET  Abstract—This paper presents short-term fixed and variable head hydrotherml scheduling. An integrated PSO-SQP technique is applied to obtain the optimum scheduling of power generation. PSO is used as a global search optimization technique which explores the search space. Sequential quadratic programming (SQP) is used as a local search ...

متن کامل

Solving Short Term Multi Chain Hydrothermal Scheduling Problem by Artificial Bee Colony Algorithm

This paper presents an artificial bee colony algorithm for solving optimal short term hydrothermal scheduling problem. To demonstrate the effectiveness of the proposed algorithm, hydrothermal test system consists of three thermal units and four cascaded hydro power plants has been tested. The valve point loading effect is taken into consideration. In order to show the feasibility and robustness...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energies

سال: 2019

ISSN: 1996-1073

DOI: 10.3390/en12030551