Hybrid Grey Wolf Algorithm for Energy-Efficient Scheduling with Sequence-Dependent Setup Times: A Case Study
نویسندگان
چکیده
منابع مشابه
Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...
متن کاملNew scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
In the literature, the application of multi-objective dynamic scheduling problem and simple priority rules are widely studied. Although these rules are not efficient enough due to simplicity and lack of general insight, composite dispatching rules have a very suitable performance because they result from experiments. In this paper, a dynamic flexible flow line problem with sequence-dependent se...
متن کاملA bi-objective model for the assembly flow shop scheduling problem with sequence dependent setup times and considering energy consumption
متن کامل
An Effective Hybrid Genetic Algorithm for Hybrid Flow Shops with Sequence Dependent Setup Times and Processor Blocking
Hybrid flow-shop or flexible flow shop problems have remained subject of intensive research over several years. Hybrid flow-shop problems overcome one of the limitations of the classical flow-shop model by allowing parallel processors at each stage of task processing. In many papers the assumptions are generally made that there is unlimited storage available between stages and the setup times a...
متن کاملA Hybrid Algorithm for Solving the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Times
This work addresses the unrelated parallel machine scheduling problem where setup times are sequence-dependent and machine-dependent. The maximum completion time of the schedule, known as makespan, is considered as an objective to minimize. Few studies has been done about this problem, which is a motivation to the development of this work. Other motivations are the fact that it is NP-Hard and i...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IOP Conference Series: Materials Science and Engineering
سال: 2021
ISSN: 1757-8981,1757-899X
DOI: 10.1088/1757-899x/1096/1/012116