Identification Factors Affecting Variation and Change Order of Design-Build Projects

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon

Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far Ea...

متن کامل

Factors Affecting Evaluation of E-Business Projects

The 2003 survey among Slovenian companies was studying the factors affecting the formal evaluation of e-business projects. The corresponding causal model revealed that the perceptions and the attitudes towards e-business strongly affect the corresponding evaluation practice. In particular, the recognition of the needs for corresponding evaluation had the strongest effect. On the other hand, the...

متن کامل

The Role of Modelling and Simulation in Design-build Projects

The paper discusses the role of modelling and simulation techniques in large scale construction projects focusing on the opportunities and on the modelling challenges that are specific to this context of application. The paper argues that a methodology based on dynamic multi-process simulation models provides powerful decision support when assessing the performance implications of changes in th...

متن کامل

Identifying the Factors Affecting Manufacturing Investment Projects and Using TOPSIS Method for Prioritizing Projects

For many cases, grading and prioritizing the projects are so important in project-based organizations. In fact, it means prioritizing some projects and allocating organizational resource only to those projects to reach the organization profit up to maximum level through such allocation and decision. There are many different factors contribute in choosing the best project combination for organiz...

متن کامل

Assessing the Effective Factors on JudgingArchitectural Design Projects of UniversityStudents

Since nature of architecture is quite different from that of other fields of study, the criteria used forjudging projects in this field continuously undergo some changes. On the other hand, because of the undeniable role ofhuman factors in judging the projects, there is always a percentage of deviation from the standard given the interestsof the judging committee. The standards of judging archi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Research in World Economy

سال: 2020

ISSN: 1923-399X,1923-3981

DOI: 10.5430/rwe.v11n3p59