Identification of Project Construction Delay Factors in Depok City, West Java (Study in Department of Housing and Settlement, Depok City)

نویسندگان

چکیده

Depok is one of the big cities in West Java, and it a buffer zone for capital city Indonesia, Jakarta. Hence, government very active developing city, especially building housing settlements. There are many projects handled by but often delayed. To solve these problems, purpose this research to identify construction project delay factor. 5 variables studied study such as owner factors, contractor consultant shared responsibility external factors. This with qualitative approach conducting literature review results will be validated experts following provisions Project Management Institute. The analysis show that variables, namely factors valid influencing delays City. expected have positive implications become reference mitigating risk determining control measures future City other cities. Keywords: Delay, Delay Factor, Construction, Housing Project,

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The pre-diabetic epidemiological study in Depok, West Java.

OBJECTIVE To recognize the prevalence of impaired fasting glucose level (IFG) and impaired glucose tolerance (IGT) in general population of Depok Area, West Java. METHODS the study was conducted in a population with age > or = 25 years, in Depok Area, West Java, which was selected by using two stage random sampling. Data were collected by using the Step Wise Approach of WHO. Subjects without ...

متن کامل

the effect of the record infancy in crimilly acts of guilties (in karaj city)

چکیده یکی از مهمترین دغدغه های بزرگ جوامع بشری، از دیر باز تا کنون که ذهن پژوهشگران و متخصصان بهداشت روانی و اجتماعی و دولتها رابه خود مشغول داشته، مسأله ی بزهکاری می باشد. شناخت کامل پدیده ی بزهکاری و بزهکار، علل وعوامل سقوط یک انسان، چگونگی درمان وی و درنهایت پیشگیری ازبزهکاری ودریک کلام سالم سازی یک جامعه، رسالت عظیم، انسانی ومقدسی می باشد که با بررسی شخصیت مجرم یعنی[ انسانی که تحت شرای...

15 صفحه اول

this study investigated the relationship between quality of work life and organization citizenship behavior from the viewpoint of teachers in high schools in tehran city.

چکیده هدف از پژوهش حاضر بررسی رابطه کیفیت زندگی کاری و رفتار شهروندی سازمانی در مدارس مقطع متوسطه پسرانه شهر تهران از دیدگاه دبیران بود. روش پژوهش حاضر توصیفی و از نوع همبستگی بود. از بین دبیران مدارس شهر تهران تعداد 380 نفر به روش نمونه گیری خوشه ای چند مرحله ای به عنوان نمونه پژوهش انتخاب شدند و با تکمیل پرسشنامه ی کیفیت زندگی کاری والتون(1975) و پرسشنامه ی رفتار شهروندی سازمانی پودساکو...

15 صفحه اول

Dietary trans fatty acids intake and its relation to dyslipidemia in a sample of adults in Depok city, West Java, Indonesia.

INTRODUCTION The Basic Health Research of the Ministry of Health Indonesia in 2008 reported that the single most important cause of death was stroke, in both urban and rural populations. The risk factors underlying the cause of death are associated with hypertension, obesity and dyslipidemia. The purpose of this study was to determine the mean intake of trans fatty acids and its relation to dys...

متن کامل

Residential Satisfaction and its Related Factors among the Residents in Mehr Housing Project of Parand City

Expended Abstract Introduction: Residential satisfaction is one of the factors affecting the social wellbeing. Residence satisfaction has a complex theoretical structure and infolded concepts from economics, sociology, psychology, planning, and geography. Understanding the important dimensions of residential satisfaction will play an effective role in wellbeing. In addition to personal, phys...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Applied Business and International Management

سال: 2022

ISSN: ['2621-2862', '2614-7432']

DOI: https://doi.org/10.32535/ijabim.v7i3.1959