Impact of linear correlation on construction project performance using stochastic linear scheduling
نویسندگان
چکیده
منابع مشابه
on the effect of linear & non-linear texts on students comprehension and recalling
چکیده ندارد.
15 صفحه اولLinear preselective policies for stochastic project scheduling
We introduce a new class of policies for stochastic project scheduling with resource constraints, the linear preselective policies. They combine the benefits of two known classes of scheduling policies for stochastic and deterministic scheduling, viz. priority policies and preselective policies. Priority policies solve resource conflicts by means of a priority list (list scheduling). They have ...
متن کاملthe impact of using inspirational quotes on abstract vocabulary recall
the present study is an attempt to investigate the potential impact of inspirational quotes on improving english abstract vocabulary recall. to achieve this goal, a multiple choice language proficiency test of 60 items including vocabulary and grammar component was administered to a sample of 63 second-semester male and female students whose age ranged between 17 to 22 and they were studying en...
15 صفحه اولRepetitive construction processes scheduling using mixed-integer linear programming
Many construction projects contain several identical or similar units, such as floors in multistory buildings, houses in housing developments, sections of pipelines or highways. Repetitive processes arise from the subdivision of a generalized construction process into specific activities associated with particular units. In many cases it is possible to perform individual processes (repeated in ...
متن کاملScheduling Repetitive Construction Projects Using Fuzzy Linear Programming
Scheduling problem for repetitive construction projects involves three conflicting objectives. These objectives are project duration, project total cost, and project total interruption time. This paper presents a multi-objective fuzzy linear programming model (FLP) for resolving this problem. Literature concerned with scheduling problems for repetitive construction projects was reviewed. Multi-...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Visualization in Engineering
سال: 2017
ISSN: 2213-7459
DOI: 10.1186/s40327-017-0045-2