Impact of modularization and site staffing on construction schedule of small and large water reactors
نویسندگان
چکیده
• Methodology for estimating the construction duration of nuclear projects. Construction schedules 3 large and small water reactors are estimated. Smaller more insensitive to staffing constraints. sensitive modularization assumptions. Recent project in US Europe were 2.5x their original estimates due productivity misses, supply chain challenges, hiring constraints, other issues. Small modular proposed as a remedy. will require one fourth third person-hours labor leverage common chains, putting less strain on each step process. This study presents methodology projects, so sensitivity concepts constraints can be analyzed. The builds previous overnight capital cost estimation tool Gantt chart out 226 tasks. genetic algorithm assigns resources task minimize time subject peak rate results consistently within 15% seven benchmark durations. Under tighter increased 42% average only 3% reactors. Modularization systems structures reduced durations 60%, but it assumptions because compact layout, power specific ($/kW) was higher, total financial impact smaller costs lower.
منابع مشابه
the impact of attending efl classes on the level of depression of iranian female learners and their attributional complexity
می توان گفت واقعیت چند لایه ا ی کلاس های زبان انگلیسی بسیار حائز اهمیت است، زیرا عواطف و بینش های زبان آموزان تحت تاثیر قرار می گیرد. در پژوهش پیش رو، گفته می شود که دبیران با در پیش گرفتن رویکرد فرا-انسانگرایی ، قادرند در زندگی دانش آموزانشان نقش مهمی را ایفا سازند. بر اساس گفته ی ویلیامز و بردن (2000)، برای کرل راجرز، یکی از بنیان گذاران رویکرد انسانگرایی ، یادگیری بر مبنای تجربه، نوعی از یاد...
an investigation of the impact of self monitoring on langauge teachers motivational practice and its effect on learners motivation
the central purpose of this study was to conduct a case study about the role of self monitoring in teacher’s use of motivational strategies. furthermore it focused on how these strategies affected students’ motivational behavior. although many studies have been done to investigate teachers’ motivational strategies use (cheng & d?rnyei, 2007; d?rnyei & csizer, 1998; green, 2001, guilloteaux & d?...
construction and validation of the translation teacher competency test and the scale of students’ perceptions of translation teachers
the major purpose of this study was to develop the translation teacher competency test (ttct) and examine its construct and predictive validity. the present study was conducted in two phases: a qualitative phase as well as a quantitative phase. in the first phase of the study, the author attempted to find out the major areas of competency required for an academic translation teacher. the second...
effect of seed priming and irrigation regimes on yield,yield components and quality of safflowers cultivars
این مطالعه در سال 1386-87 در آزمایشگاه و مزرعه پژوهشی دانشگاه صنعتی اصفهان به منظور تعیین مناسب ترین تیمار بذری و ارزیابی اثر پرایمینگ بر روی سه رقم گلرنگ تحت سه رژیم آبیاری انجام گرفت. برخی از مطالعات اثرات سودمند پرایمینگ بذر را بر روی گیاهان مختلف بررسی کرده اند اما در حال حاضر اطلاعات کمی در مورد خصوصیات مربوط به جوانه زنی، مراحل نموی، عملکرد و خصوصیات کمی و کیفی بذور تیمار شده ژنوتیپ های م...
the impact of generative learning strategy use on efl learners’ reading achievement and critical thinking
این پژوهش کوشیده است تأثیر به کارگیری راهبردهای زایا را بر پیشرفت و بسندگی در خواندن و درک مطلب و نیز بر تفکر انتقادی زبان آموزان انگلیسی را بررسی کند. در این پژوهش تعداد 46 دانش آموز دختر در مقطع متوسطه اول به صورت تصادفی انتخاب وبه دو گروه تجربی و شاهد با تعداد دانش آموزان مساوی در هر گروه تقسیم شدند. به هر دو گروه سه داستان کوتاه به عنوان موضوع خواندن برای کلاس داده شد. به گروه تجربی درابتدا...
ذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Nuclear Engineering and Design
سال: 2022
ISSN: ['0029-5493', '1872-759X']
DOI: https://doi.org/10.1016/j.nucengdes.2022.111922