Implementation of Earned Value Management in Unit-Price Payment Contracts
                    
                        
                            نویسندگان
                            
                            
                        
                        
                    
                    
                    چکیده
منابع مشابه
Earned - Value Management Terminology
To the Editor: Although I enjoyed the article titled “Value-Based Software Engineering: A Case Study” (Barry Boehm and Li Guo Huang, March 2003, pp. 33-41), as a newly minted Project Management Professional and a contributor to the Project Management Institute’s Earned Value Analysis team, I was disappointed with the authors’ use of nonstandard terminology. The authors renamed the traditional t...
متن کاملImportant Factors for Organizational Performance Evaluation through Implementation of Earned Value Management (EVM) in North Taiwan
In order to cope with the rapid changes in the world, enterprises utilize project management methodology to globally outsource their works and to evaluate their internal and external work performance. Of all the project management techniques, Earned Value Management (EVM) is the major one that provides a method to evaluate project performance by integrating schedule and cost of work packages. E...
متن کاملStrategies for implementation of Payment for Ecosystem Services (PES) in Rangeland Management of North Khorasan Province
This article has no abstract.
متن کاملAnalysis and Application of Earned Value Management in Software Development
Earned Value Management (EVM) is a well-known cost and schedule management technique in government and defense industry projects. Its usage, however, is not as wide spread in the general software industry. In this paper we explore some of the shortcomings in EVM and suggest several improvements in the application of EVM in software development projects. In particular, we analyze the nature of s...
متن کاملKeyword Auctions, Unit-Price Contracts, and the Role of Commitment
Motivated by the enormous growth of keyword advertising, this paper explores the design of performance-based unitprice contract auctions, in which bidders bid their unit prices and the winner is chosen based on both their bids and performance levels. The previous literature on unit-price contract auctions usually considers a static case where bidders’ performance levels are fixed. This paper st...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Management in Engineering
سال: 2017
ISSN: 0742-597X,1943-5479
DOI: 10.1061/(asce)me.1943-5479.0000500