Improving the operational efficiency of tractors by ensuring their ability to perform work
نویسندگان
چکیده
منابع مشابه
the relationship between learners critical thinking ability and their performance in the reading sections of the tofel and ielts test
the study reflected in this thesis aims at finding out relationships between critical thinking (ct), and the reading sections of tofel and ielts tests. the study tries to find any relationships between the ct ability of students and their performance on reading tests of tofel and academic ielts. however, no research has ever been conducted to investigate the relationship between ct and the read...
15 صفحه اولImproving the Operational Efficiency of Public Transport
Improving the efficiency of public transport systems is a critical problem. In order to help implement strategies for improving efficiency, public transport managers and researchers need access to an upto-date information system that fully describes these strategies including data on their quantitative benefits. This research outlines a proposal for developing such a database and how it might b...
متن کاملAbility of elementary school children to perform sulcular toothbrushing as related to their hand function ability.
متن کامل
assessment of the efficiency of s.p.g.c refineries using network dea
data envelopment analysis (dea) is a powerful tool for measuring relative efficiency of organizational units referred to as decision making units (dmus). in most cases dmus have network structures with internal linking activities. traditional dea models, however, consider dmus as black boxes with no regard to their linking activities and therefore do not provide decision makers with the reasons...
Improving and Maintaining the Operational Efficiency of a Semiconductor Equipment
The present work addresses an operational inefficiency problem at a semiconductor equipment manufacturing warehouse, Varian Semiconductors Associates and Equipment (VSEA). This problem is important because if unresolved, the warehouse is unable to meet the part delivery time target of 24 hours during the busy period. The downstream effects of the late part delivery are delayed production schedu...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: BIO Web of Conferences
سال: 2020
ISSN: 2117-4458
DOI: 10.1051/bioconf/20201700111