Input selection for long-lead precipitation prediction using large-scale climate variables: a case study

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

prediction of monthly precipitation based on large-scale climate signals using intelligent models and multiple linear regression (case study: semnan synoptic station)

large-scale climatic signals including ocean-atmosphere interactions, are the main factors influencing the earth’s climatic oscillations and are the most important indices in predicting of climate variables. in this research, precipitation in the next month was predicted by applying artificial neural network (ann), neuro-fuzzy network (nfn), and multiple linear regression (mlr) in semnan synopt...

متن کامل

Forecasting of rainfall using different input selection methods on climate signals for neural network inputs

Long-term prediction of precipitation in planning and managing water resources, especially in arid and semi-arid countries such as Iran, has a great importance. In this paper, a method for predicting long-term precipitation using weather signals and artificial neural networks is presented. For this purpose, climatic data (large-scale signals) and meteorological data (local precipitation and tem...

متن کامل

Stability analysis and selection of optimuim support system of large scale underground space-Case study

The Azad pumped storage power plant including the pumping and transformer cavern and surge tanks has been located in the Sanandaj-Sirjan formation with the alternation of slate and phyllite and meta sandstone.Due to the sensitivity and special use of these spaces, stability analysis and ensuring the safety of carven is very important.Nowadays, using the surface storage tanks is very costly; The...

متن کامل

Input Selection for Long-Term Prediction of Time Series

Prediction of time series is an important problem in many areas of science and engineering. Extending the horizon of predictions further to the future is the challenging and difficult task of long-term prediction. In this paper, we investigate the problem of selecting noncontiguous input variables for an autoregressive prediction model in order to improve the prediction ability. We present an a...

متن کامل

metrics for the detection of changed buildings in 3d old vector maps using als data (case study: isfahan city)

هدف از این تحقیق، ارزیابی و بهبود متریک های موجود جهت تایید صحت نقشه های قدیمی سه بعدی برداری با استفاده از ابر نقطه حاصل از لیزر اسکن جدید شهر اصفهان می باشد . بنابراین ابر نقطه حاصل از لیزر اسکنر با چگالی حدودا سه نقطه در هر متر مربع جهت شناسایی عوارض تغییر کرده در نقشه های قدیمی سه بعدی استفاده شده است. تمرکز ما در این تحقیق بر روی ساختمان به عنوان یکی از اصلی ترین عارضه های شهری می باشد. من...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Hydroinformatics

سال: 2014

ISSN: 1464-7141,1465-1734

DOI: 10.2166/hydro.2014.138