Integer programming models for hierarchical workforce scheduling problems including excess off-days and idle labour times
نویسندگان
چکیده
منابع مشابه
An integer programming model for hierarchical workforce scheduling problem
In this paper, an integer programming model for the hierarchical workforce problem under the compressed workweeks is developed. The model is based on the integer programming formulation developed by Billionnet [A. Billionnet, Integer programming to schedule a hierarchical workforce with variable demands, European Journal of Operational Research 114 (1999) 105–114] for the hierarchical workforce...
متن کاملOptimum workforce scheduling under the (14, 21) days-off timetable
An efficient optimum solution is presented for a real-life employee daysoff scheduling problem with a three-week cycle. Over a given work cycle, each worker is given 14 successive workdays and 7 successive off days. This three-week days-off timetable is referred to as the (14, 21) schedule. Given different labor demands for each day of the week, the primary objective is to minimize the number o...
متن کاملModeling and scheduling no-idle hybrid flow shop problems
Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This paper considers the problem of scheduling no-idle hybrid flow shops. A mixed integer linear programming model is first developed to mathematically form...
متن کاملA new approach for solving neutrosophic integer programming problems
Linear programming is one of the most important usages of operation research methods in real life, that includes of one objective function and one or several constraints which can be in the form of equality and inequality. Most of the problems in the real world are include of inconsistent and astute uncertainty, because of this reason we can’t obtain the optimal solution easily. In this paper, ...
متن کاملpreventive maintenance scheduling with integer programming and constraint programming
preventive maintenance scheduling is to perform a series of tasks that prevents or minimizes production breakdowns and improves the reliability. mathematical models have been developed to solve the preventive maintenance scheduling problem. there are several limitations in the prior work in this area of research. craft combinations are assumed to be given. the craft combination problem concerns...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Mathematical Modelling
سال: 2013
ISSN: 0307-904X
DOI: 10.1016/j.apm.2013.04.006