Integrated ANN-HMH Approach for Nonlinear Time-Cost Tradeoff Problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Effects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile

This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...

متن کامل

A New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management

In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...

متن کامل

The stochastic time-cost tradeoff problem: A robust optimization approach

We consider the problem of allocating resources to projects performed under given due dates and stochastic time–cost tradeoff settings. In particular, we show how to implement a state-of-the-art methodology known as “robust optimization” to solve the problem. In contrast to conventional approaches, the model we develop results in management policies rather than optimal values for the original d...

متن کامل

effects of project uncertainties on nonlinear time-cost tradeoff profile

this study presents the effects of project uncertainties on nonlinear time-cost tradeoff (tct) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ann) models with hybrid meta-heuristic (hmh) technique, abridged as fuzzy-ann-hmh. nonlinear time-cost relationship of project activities is dealt with ann models. ann models are then integrated with ...

متن کامل

a new mathematical approach based on conic quadratic programming for the stochastic time-cost tradeoff problem in project management

in this paper, we consider a stochastic time-cost tradeoff problem (tctp) in pert networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. the aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Computational Intelligence Systems

سال: 2014

ISSN: 1875-6891,1875-6883

DOI: 10.1080/18756891.2014.891368