Integrated Design Process for Modular Construction Projects to Reduce Rework

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Visualisation of Building Interior Design to Reduce Rework

A significant amount of rework in construction is caused by client last-minute changes and their inability to acquire a realistic appreciation of the product and from the 2-D drawings at the design development process. This paper introduces a computer system that enables a user to construct a 3D design model efficiently using object models stored in element libraries. The system allows the user...

متن کامل

Integrated inventory model with multi-retailer and rework process

This paper derives optimal production-shipment policy for a single-producer multi-retailer integrated inventory model with rework. We assume that a product is manufactured by a producer. All items are screened for quality assurance. Random defective items will be picked up and reworked in the same cycle when regular production ends. Upon entire lot is quality assured, multiple shipments are del...

متن کامل

The Impact of Design Rework on Construction Project Performance

Rework in construction development projects can significantly degrade project cost and schedule performance. In a typical construction development project which involves design and construction, rework in the construction phase could increase construction cost by 10%-15% of the contract price (Burati. 1992, Josephson & Hammerlund 1999, Love & Li 2000). The proportion of money and time spent on ...

متن کامل

DECOREM: A Design and Construction Rework Minimisation Model

Rework that is often experienced in construction projects is primarily caused by errors made during the design process. Factors that contribute to design errors are identified and used to design and develop a systems dynamics model, which is used to simulate a number of practical scenarios that can be used to reduce design errors and rework. The DEsign and COnstruction REwork Minimisation (DECO...

متن کامل

Getting from Design to Construction: Writing Specifications for Green Projects

often written right on the drawings. These might include a schedule of doors and windows; the type, grade, and color of the roofing material; and the like. For larger projects, the specs are provided as a separate part of the contract documents. The drawings and the specs are cross-referenced, with the basic principle that spatial relationships and dimensions belong in the drawings, while descr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2020

ISSN: 2071-1050

DOI: 10.3390/su12020530