Integrated EDM and 4D BIM-Based Decision Support System for Construction Projects Control

نویسندگان

چکیده

Project schedule monitoring and controlling are critical challenges of construction project management that not adequately implemented, likely due to the predominance earned value lack utilizing technology, such as BIM tools. Unlike value, duration (EDM) was developed, which includes several indices track progress measure performance a schedule. The goal this research establish decision support system monitor activities during construction, with better accuracy. A survey conducted distributed among ten site engineers, selected from different sites. asked engineers about possible durations certain activities; based on their answers, authors started proposed system. In study, we aimed develop (DSS), combines EDM help calculate probabilistic total duration, visually detecting activities, risky subjected delay categorizing accuracy estimated for delayed activities.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

BIM-based Integrated Framework for Detailed Cost Estimation and Schedule Planning of Construction Projects

With the increasing popularity of Building Information Modeling (BIM), several research studies have focused on its application in the construction industry, and advancements such as developments of BIM-based tools for construction scheduling and cost estimating have been carried out. Nevertheless, these tools are each developed only for one particular aspect of construction management, such as...

متن کامل

A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM)

Analyzing cash flows and undertaking project financing are important for contractors in managing construction projects. Traditional methods for cash flow analysis are based on the manual integration of time and cost information. However, the manual integration process can be automated by using five-dimensional building information modeling (5D BIM). Previous studies on 5D BIM have focused on es...

متن کامل

Virtual Reality - Based Cloud Bim Platform for Integrated Aec Projects

Building Information Modelling (BIM) has demonstrated the need for integrating collaborative design teams’ “project data”, to not only help coordinate the design, engineering, fabrication, construction, and maintenance of various trades, but also facilitate project integration and interchange. Numerous potential benefits have inspired several countries to consider the implications of implementi...

متن کامل

A Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)

Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...

متن کامل

Integrated system for BIM-based collaborative design

a r t i c l e i n f o Keywords: BIM Collaborative design Integrated design system Data exchange IFC For effective collaboration among construction project participants, the use of Building Information Model (BIM) has become more common throughout the building life cycle. However, due to the use of different BIM-based software among collaborators during the design, a variety of problems have occ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Buildings

سال: 2022

ISSN: ['2075-5309']

DOI: https://doi.org/10.3390/buildings12030315