Open pit mine production scheduling is a computationally expensive large-scale mixed-integer linear programming problem. This research develops efficient algorithm to solve open problems under uncertain geological parameters. The proposed solution approach for two-stage process. stochastic problem iteratively solved in the first stage after relaxing resource constraints using parametric graph closure algorithm. Finally, branch-and-cut applied respect constraints, which might be violated during of Six small-scale from iron and copper mines were used validate model. results demonstrated that method could significantly improve computational time with reasonable optimality gap (the maximum 4%). In addition, tested industrial-scale data compared its deterministic show net present value model improved by 6%
منابع مشابه
A genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملOpen Pit Mine Scheduling under Uncertainty: a Robust Approach
In order to carry out an open pit mining operation, planners must periodically prepare what is known as strategic mine plan. This is a tentative production schedule for the remaining life of the mine that defines which area of a mining reserve will be extracted, in what years this extraction will take place, which resources will be used for the extraction, and how the extracted material will be...
متن کاملA new algorithm for the open-pit mine scheduling problem
For the purpose of production scheduling, open pit mines are discretized into threedimensional arrays known as block models. Production scheduling consists in deciding which blocks should be extracted, when they should be extracted and how each extracted block should be processed. Blocks which are on top should be extracted first, and capacity constraints limit the production each time period. ...
متن کاملAn imperialist competitive algorithm for solving the production scheduling problem in open pit mine
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
متن کاملA variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty
Uncertainty is an inherent aspect of the open-pit mine production scheduling problem (MPSP); however, little is reported in the literature about solution methods for the stochastic versions of the problem. In this paper, two variants of a variable neighbourhood descent algorithm are proposed for solving the MPSP with metal uncertainty. The proposed methods are tested and compared on actual larg...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mining
سال: 2022
ISSN: ['2673-6489']
DOI: https://doi.org/10.3390/mining2010003