Integrated scheduling and batch ordering for construction project
نویسندگان
چکیده
منابع مشابه
An Integrated Model of Project Scheduling and Material Ordering: A Hybrid Simulated Annealing and Genetic Algorithm
This study aims to deal with a more realistic combined problem of project scheduling and material ordering. The goal is to minimize the total material holding and ordering costs by determining the starting time of activities along with material ordering schedules subject to some constraints. The problem is first mathematically modelled. Then a hybrid simulated annealing and genetic algorithm is...
متن کاملan integrated model of project scheduling and material ordering: a hybrid simulated annealing and genetic algorithm
this study aims to deal with a more realistic combined problem of project scheduling and material ordering. the goal is to minimize the total material holding and ordering costs by determining the starting time of activities along with material ordering schedules subject to some constraints. the problem is first mathematically modelled. then a hybrid simulated annealing and genetic algorithm is...
متن کاملCoordinating Order Acceptance and Batch Delivery for an Integrated Supply Chain Scheduling
This paper develops Order Acceptance for an Integrated Production-Distribution Problem in which Batch Delivery is implemented. The aim of this problem is to coordinate: (1) rejecting some of the orders (2) production scheduling of the accepted orders and (3) batch delivery to maximize Total Net Profit. A Mixed Integer Programming is proposed for the problem. In addition, a hybrid meta-heuristic...
متن کاملan inventory–scheduling model for supply chain of construction project
one of the important problems in project management is lack of available resources in proper time at project site that leads to lack of project implementation in due date. this problem may be lead to time delay in sending resources from suppliers and related origins in supply chain to project site. therfore, to better resources managmenet and also the improvement of supply chain condition, the ...
متن کاملOPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING
During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Mathematical Modelling
سال: 2014
ISSN: 0307-904X
DOI: 10.1016/j.apm.2013.07.017