Integrated staffing and scheduling for an aircraft line maintenance problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated staffing and scheduling for an aircraft line maintenance problem

This paper presents a method for constructing the workforce schedules of an aircraft maintenance company. The method integrates both the staffing and the scheduling decision. We formulate the optimization problem using a mixed integer linear programming approach and solve it heuristically using a branch-and-bound enumeration framework. Each node of the tree represents a combination of teams and...

متن کامل

Aircraft maintenance planning and scheduling: An integrated framework

Purpose – The purpose of this paper is to examine how certain limitations of the current approaches to planning and scheduling of aircraft heavy maintenance can be addressed using a single integrated framework supported by unified data structures. Design/methodology/approach – The “unitary structuring technique”, originally developed within the context of manufacturing planning and control, is ...

متن کامل

A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem

Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...

متن کامل

Current Practices and Problem Areas in Aircraft Maintenance Planning and Scheduling – Interfaced/Integrated System Perspective

Aircraft maintenance planning and scheduling constitute planning, control and execution of materials (spare parts), operations (inspection, disassembly and assembly activities) and resources (labour, machines, transport equipment, etc.). This is a complex problem due to large number of components involved at various planning and execution levels, and the size/nature of resource-intensive mainte...

متن کامل

Improving Workforce Scheduling of Aircraft Line Maintenance at Sabena Technics

This paper presents our application of a visualization tool and optimization model based on mixed-integer linear programming to solve a workforce staffing and scheduling problem at Sabena Technics, a major aircraft maintenance company in Belgium. We used the software to generate many alternative, cost-efficient schedules and to analyze multiple scenarios. In several management meetings, stakeho...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computers & Operations Research

سال: 2013

ISSN: 0305-0548

DOI: 10.1016/j.cor.2012.11.011