Integrated supply chain inventory model with quality improvement involving controllable lead time and backorder price discount
نویسندگان
چکیده
منابع مشابه
Integrated Inventory Model with Controllable Lead Time Involving Investment for Quality Improvement in Supply Chain System
The purpose of this article is to investigate a two-echelon supply chain inventory problem consisting of a single-vendor and a single-buyer with controllable lead time and investment for quality improvements. This paper presents an integrated vendor-buyer inventory model in order to minimize the sum of the ordering cost, holding cost, setup cost, investment for quality improvement and crashing ...
متن کاملintegrated inventory model with controllable lead time involving investment for quality improvement in supply chain system
the purpose of this article is to investigate a two-echelon supply chain inventory problem consisting of a single-vendor and a single-buyer with controllable lead time and investment for quality improvements. this paper presents an integrated vendor-buyer inventory model in order to minimize the sum of the ordering cost, holding cost, setup cost, investment for quality improvement and crashing ...
متن کاملIntegrated inventory models with controllable lead time and backorder discount considerations
Many companies use time as a means of differentiating themselves in the marketplace. In many literatures, the controllable lead time is regarded as a decision variable and decomposed into several components, each having a crashing cost function for the respective reduced lead time. When an item is out of stock, the loyal, patient and captive customers will wait until the outstanding orders arri...
متن کاملAn Integrated Supply Chain Inventory Model with Imperfect-quality Items, Controllable Lead Time and Distribution-free Demand
In this paper, we consider an integrated vendor-buyer inventory policy for a continuous review model with a random number of defective items and screening process gradually at a fixed screening rate in buyer’s arriving order lot. We assume that shortages are allowed and partially backlogged on the buyer’s side, and that the lead time demand distribution is unknown, except its first two moments....
متن کاملPeriodic inventory model with unstable lead-time and setup cost with backorder discount
The main purpose of this study is to investigate the periodic inventory model with backorder price discounts, where shortages are partially backlogged. The application of just-in-time (JIT) philosophy i.e., crashing of the lead-time and setup cost has been carried component wise. Two cases have been discussed viz 1 protection interval demand distribution is known (normal distribution approach) ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Industrial Engineering Computations
سال: 2016
ISSN: 1923-2926,1923-2934
DOI: 10.5267/j.ijiec.2015.12.003