Interactions-based risk clustering methodologies and algorithms for complex project management
نویسندگان
چکیده
منابع مشابه
Analysis of interactions among barriers in project risk management
In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success...
متن کاملdeveloping a risk management model for project based organizations
uncertainties in industrial environments can cause considerable complexities, during the implementation and management of projects. so, performing a risk management model in such environments has become inevitable. in such circumstances, many risk management models have been introduced in literature, which majorities of them are general, while some of them are developed to be applied to specifi...
متن کاملAn Integrated Risk-Based Technique for Project Plan Selection
Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...
متن کاملProject Management and Agile Methodologies: A Survey
This paper examines analogies and differences derived by the adoption of Agile Methodologies (AMs) in a set of software companies from the point of view of project management techniques. Data come from questionnaires filled in by twenty-one managers. The analysis of these questionnaires shows that managers using AMs focus on people and process more than the other managers do. The adoption of AM...
متن کاملUsing fuzzy FMEA and fuzzy logic in project risk management
Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Production Economics
سال: 2013
ISSN: 0925-5273
DOI: 10.1016/j.ijpe.2010.11.022