Investigation of Environmental Loading During Building Construction
نویسندگان
چکیده
منابع مشابه
Environmental risk assessment of a dam during construction phase
The present study was conducted to assess the possible risks induced by construction of Gavi Dam in Ilam Province; western part of Iran, using MIKE-11 model and technique for order of preference by similarity to ideal solution. For this purpose, vulnerable zone of the dam site against the flooding risk of Gavi River was calculated for different return periods. The flooding zones were stimulated...
متن کاملInsect-proofing during Building Construction
TRUCTURAL AND HOUSEHOLD PEST S CONTROL in the United States requires annual expenditures of hundreds of millions of dollars and the services of 27,000 licensed pest control operators. Preventive measures against structural and household pests should be taken during the construction of a building, because such measures are most effective and economical at that time. Preventive measures fall into...
متن کاملEffects of Building Construction Overburden on Liquefaction Potential of Soils
As one of the significant phenomena in earthquake geotechnical engineering, liquefaction can cause severe damages. A number of factors play a role in the occurrence of liquefaction such as magnitude of earthquake, void ratio, relative density, and fines content percentage. The impact of building construction overburdens on liquefaction is of paramount importance. The present study was aimed at ...
متن کاملInvestigation of lower-limb tissue perfusion during loading.
An extant tissue indentor used for amputee residual limb tissue indentation studies was modified to include laser Doppler flowmetry (LDF) to enable measurement of tissue perfusion during indentation. This device allows quantitative assessment of the mechanical and physiological response of soft tissues to load, as demonstrated by indentation studies of the lower-limb tissues of young healthy su...
متن کاملMonitoring of Cheragh-veis Dam During Construction Using Instrumentation Data and Investigation of dam behavior during impounding
One of the most important challenges in development projects beside designing and performing them is to control immunity and stability of the several parts during different stages of construction, impoundment, and operation. The main purpose of instrumentation in dams is to evaluate operation and reaction of these structures under different load conditions, developing a better understanding...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Japan Society of Waste Management Experts
سال: 2000
ISSN: 1883-1648,1883-163X
DOI: 10.3985/jswme.11.74