ORTEC Predicts the Payback Period for its Workforce Scheduling Software
ORTEC is a Netherlands-based software company selling decision support systems based on operations research models. One of her products is HARMONY, a workforce scheduling package. We developed a model to predict its return on investment for a specific customer. The model uses a database of reference implementations to find organizations that are similar to the prospective customer’s organizatio...
متن کاملInvestment incentives and airport regulation
Arguments for and against the proposition that price-capped privatised utilities have an incentive to under-invest are examined in the context of airport regulation. The general proposition finds support from generic arguments associated with the hold-up problem and with ex-post opportunism. Three counter arguments are then considered: that under-investment imposes additional internal costs on ...
متن کاملThe Discounted Payback in Investment Appraisal: A Case Study
The purpose of this paper is to study a Monte Carlo simulation of the discounted payback, and its application to investment appraisal. The underlying project in the case study has a useful life of 10 years with an initial outlay of $2,000, and with stochastic, independent, and normally distributed cash inflows. These cash inflows are simulated from the same normal frequency distribution, i.e. f...
متن کاملAn Optimum Model for the Design of Airport Aprons
In the process of the optimum design of aprons, solutions should be found for problems and such issues as the optimum area and dimensions of the apron, including the passenger and the cargo the number and dimensions of the gates on the basis of different types of aircraft parking configuration aircraft simulation and arrangement in different time periods of the given day at the airport. In this...
متن کاملAn Optimum Model for the Design of Airport Aprons
In the process of the optimum design of aprons, solutions should be found for problems and such issues as the optimum area and dimensions of the apron, including the passenger and the cargo the number and dimensions of the gates on the basis of different types of aircraft parking configuration aircraft simulation and arrangement in different time periods of the given day at the airport. In this...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematical Problems in Engineering
سال: 2020
ISSN: 1024-123X,1563-5147
DOI: 10.1155/2020/9746153