Investment project efficiency and risk evaluation: an integrated approach

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Integrated Efficiency–Risk Approach in Sustainable Project Control

The lack of integrated project control techniques covering both qualitative and quantitative indices is one of the most important reasons leading to unfinished projects under predetermined schedules and expected budgets. Two modern techniques proposed in project control—the critical chain method and buffer management (CCM/BM), and the earned value analysis or earned value management and earned ...

متن کامل

An Integrated Risk-Based Technique for Project Plan Selection

  Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...

متن کامل

an integrated risk-based technique for project plan selection

selecting an effective project plan is a significant area in the project management. the present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. the efficient frontier includes two criteria: the project cost and the project time. besides, the paper presents a scheme to incorporate directed acyc...

متن کامل

SMP: An Integrated Approach to Project Management

SMP is a project management tool specifically designed for process oriented software projects. It integrates six project management functions: process modeling, effort estimation, planning, tracking, control and measurement. Their integration is based on three basic principles : i) a project plan should follow from a process model; ii) effort estimation should be based on project historical dat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Business Informatics

سال: 2018

ISSN: 1998-0663,2587-8166

DOI: 10.17323/1998-0663.2018.4.54.65