JIT single machine scheduling problem with periodic preventive maintenance

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

a heuristic algorithm for solving single machine scheduling problem with periodic maintenance

in this paper, the scheduling problem with nonresumable jobs and maintenance process is considered in order to minimize the makespan under two alternative strategies. the first strategy is to implement the maintenance process on the machine after a predetermined time period and the second one is to consider the maximum number of jobs that can be done with a special tool. we have proposed a new ...

متن کامل

Single-machine scheduling with periodic maintenance to minimize makespan

We consider a single-machine scheduling problem with periodic maintenance activities. Although the scheduling problem with maintenance has attracted researchers’ attention, most of past studies considered only one maintenance period. In this research several maintenance periods are considered where each maintenance activity is scheduled after a periodic time interval. The objective is to find a...

متن کامل

Periodic flexible maintenance planning in a single-machine production environment

Preventive maintenance is the essential part of many maintenance plans. From the production point of view, the flexibility of the maintenance intervals enhances the manufacturing efficiency. On the contrary, the maintenance departments tend to know the timing of the long term maintenance plans as certain as possible. In a single-machine production environment, this paper proposes a simulation–o...

متن کامل

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Industrial Engineering International

سال: 2016

ISSN: 1735-5702,2251-712X

DOI: 10.1007/s40092-016-0147-9