Keystone players in collaborative building information modeling — form of contribution in Japanese large-scale projects

نویسندگان

چکیده

The stagnation of construction productivity is becoming increasingly serious in Japan with the decreasing workforce. Although BIM has attracted attention to overcome this problem, its adoption not progressed among small organizations. Expanding use should be driven by influence large This paper stratifies users cross-analysis using log mining, a newly emerging analytics approach based on Autodesk Revit, combined recorded software session times other improve shortcomings existing method. target company, Japanese general contractor, where external dispatched personnel accounted for most activities, needed recognize permanent employees who undertake crucial role promoting cooperative projects termed keystone players. machine learning-based clustering algorithm and visual discovered group collaborative whose intensity was weaker than proficient but provided substantial proportion team's workforce, including multiple applications. semi-structured interviews as verification process further clarified that they positively perceive collaboration operators; while delegating tasks, strive their own knowledge respect equal collaboration. methodology provides an indispensable dashboard project communication, which pivotal factor influencing utilization whole industry. contribution research threefold; extended mining technique, discovery players, exclusive focus relationship environment.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Web-based GeneChip analysis system for large-scale collaborative projects

UNLABELLED The Web-Based GeneChip Analysis System (WGAS) is developed to overcome limitations in analysis setup efficiency, data and procedure sharing, as well as security issues in existing commercial and public domain solutions. It also incorporates unique functions and resources for more accurate and flexible GeneChip analysis. AVAILABILITY WGAS is freely available at: http://arrayanalysis...

متن کامل

application of brand personality scale in automobile industry: the study of samand’s brand personality dimensions

این تحقیق شخصیت برند سمند را در ایران با استفاده از مدل پنج بعدی آکر (1997) بعنوان یک چهارچوب بطور توصیفی سنجیده است. بنابر این چهارچوب که دراصل در 42 جزء (42 ویزگی شخصیتی) ودر پنج بعد شخصیتی طراحی شده بود ودر کشورها وصنایع مختلف آزموده شده بود, پرسنامه به زبان فارسی ترجمه شده و با استفاده از روشهای ترجمه معکوس و مصاحبه عمیق با 12 متخصص ایرانی به 38 جزء کاهش یافت. و نظرسنجی ای در پنج نمایندگی ا...

15 صفحه اول

A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects

Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...

متن کامل

Collaborative Maintenance in Large Open-Source Projects

The paper investigates collaborative work among maintainers of open source software by analyzing the logs of a set of 10 large projects. We inquire whether teamwork can be influenced by several characteristics of code. Preliminary results suggest that collaboration among maintainers in most large open-source projects seems to be positively influenced by file vintage and by Halstead volume of fi...

متن کامل

Modeling construction time in Spanish building projects

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Information Technology in Construction

سال: 2022

ISSN: ['1874-4753']

DOI: https://doi.org/10.36680/j.itcon.2022.034