Knowledge-based risk management model: application in hydropower station projects

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Towards Knowledge Based Risk Management Approach in Software Projects

All projects involve risk; a zero risk project is not worth pursuing. Furthermore, due to software project uniqueness, uncertainty about final results will always accompany software development. While risks cannot be removed from software development, software engineers instead, should learn to manage them better (Arshad et al., 2009; Batista Webster et al., 2005; Gilliam, 2004). Risk Managemen...

متن کامل

Risk Management Plan in Large Urban Projects

One of the risks distinguishes urban projects from other projects is to purchase of property obstacles. The matter is of more significance in large projects. Issues with regard to possessing property obstacles, lack of accurate layout drawings for underground facilities and following probable changes in designs make it vital to have specific studies on risk management of such projects. So thi...

متن کامل

Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Brazilian Journal of Operations & Production Management

سال: 2020

ISSN: 2237-8960,1679-8171

DOI: 10.14488/bjopm.2020.046