Knowledge push system based on work breakdown structure and ontology
نویسندگان
چکیده
منابع مشابه
Project Management System Based on Work-Breakdown-Structure Process Model
We have developed a “WBS(Work Breakdown Structure) process model” for a business application software development project. We have also developed a project management system called “PRO-NAVI” which works on the “WBS process model.” This WBS process model” provides (1) mutual mapping between the “software development processes”, “activities”, “products”, “know-how,” “rules”, and “standards”, and...
متن کاملin translation: translators on their work and what it means
کتاب در باب ترجمه، اثر استر آلن و سوزان برنوفسکی منتشر شده در ماه می 2013 توسط نشریه کلمبیا است. نویسندگان در این کتاب به بررسی 18 مترجم با در نظر گرفتن نقش آثاری که این مترجمان ترجمه کرده اند میپردازند. کتاب به دو بخش تقسیم میشود: " مترجم در جهان" و " کار مترجم" این دو بخش مقالات همیشگی ترجمه و موقعیت خاص ادبیات بیگانه در جهان وسیع امروزی را مورد خطاب قرار میدهد. در این کتاب مقالات متعددی از ن...
Integrating Process and Work Breakdown Structure with Design Structure Matrix
∗Department of Computer Science and Information Engineering, National Central University, Jhongli, Taiwan E-mail: {yjlee, jass, wtlee, jielee}@selab.csie.ncu.edu.tw ∗∗Department of Computer and Information Science, National Taichung University, Taichung, Taiwan E-mail: [email protected] ∗∗∗Department of Computer Science and Engineering, National Taiwan Ocean University, Keelung, Taiwan E-m...
متن کاملSoil Knowledge Intelligent Retrieval System Based on Ontology
With the development and popularization of Internet, The research focuses on how to get the requirement quickly and exactly from a large number of information. Using ontology provides a new intelligent searching method based on Web. In this paper, According to ontology theory of agriculture's characters and combining with the major of soil and agricultural chemistry, the retrieval system took t...
متن کاملSystem Framework of Tacit Knowledge Management based on Ontology
Tacit knowledge (TK) transform and sharing is hard to break though in both academe and application. Combining TK management actuality and problems in KM, the transform process of enterprise TK is analyzed and a transform management framework of enterprise TK is proposed based on ontology. On the basis of the framework, a TK exchange and sharing platform is proposed based on network and the stru...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Physics: Conference Series
سال: 2021
ISSN: 1742-6588,1742-6596
DOI: 10.1088/1742-6596/1812/1/012028