Layout Optimization Model for the Production Planning of Precast Concrete Building Components
نویسندگان
چکیده
منابع مشابه
faciliting lexical access for the fluent production of speech
the hypothesis is that recent and frequent exposure to lexical items leads to a more fluent production of speech in terms of rate of speech. to test the hypothesis,a one-way anova experimental design was carried out. 24 sednior students of efl participated in a one-way interview test. data analyses revealed that those who were exposed frequently to the lexical items over a week prior to inter...
15 صفحه اولfacilitating lexical access for the fluent production of speech
the hypothesis is that recent and frequent exposure to lexical items leads to a more fluent production of speech in terms of rate of speech. to test the hypothesis , a one- way anova experimental design was carried out. 24 senior student of efl participated in a one-way interview test. data analyses revealed that those who were exposed frequently to the lexical items over a week prior to inte...
15 صفحه اولthe use of appropriate madm model for ranking the vendors of mci equipments using fuzzy approach
abstract nowadays, the science of decision making has been paid to more attention due to the complexity of the problems of suppliers selection. as known, one of the efficient tools in economic and human resources development is the extension of communication networks in developing countries. so, the proper selection of suppliers of tc equipments is of concern very much. in this study, a ...
15 صفحه اولA mathematical model for the design of distributed layout by considering production planning and system reconfiguration over multiple time periods
In this paper, we develop a new mathematical model that integrates layout configuration and production planning in the design of dynamic distributed layouts. The model incorporates a number of important manufacturing attributes such as demand fluctuation, system reconfiguration, lot splitting, work load balancing, alternative routings, machine capability and tooling requirements. In addition, t...
متن کاملUtilizing Radio Frequency Identification on Precast Concrete Components – Supplier’s Perspective
Precast concrete material suppliers are responsible for the components that they manufacture from casting until up to 25 years after installation. To effectively manage the production and storage at a the production facility, to streamline the construction process and to quickly repair a component should there be a problem, information about components must be readily available and updated thro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2018
ISSN: 2071-1050
DOI: 10.3390/su10061807