Lead time anticipation in Supply Chain Operations Planning

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Lead time anticipation in Supply Chain Operations Planning

Linear programming (LP) models for Supply Chain Operations Planning (SCOP) are widely used in Advanced Planning Systems. The solution to the LP model is a proposal for order releases to the various production units (PU) in the supply network. As we have to account for uncertainty at the shop floor, the relationship between work-in-progress (WIP) and lead time is non-linear which makes it diffic...

متن کامل

Cost Implications of Planned Lead Times in Supply Chain Operations Planning

In this paper we consider Supply Chain Operations Planning (SCOP) in a rolling horizon context under demand uncertainty. Production plans are calculated using a linear programming model. While in most mathematical programming models for SCOP the lead time is considered to be equal to zero or equal to the minimum processing time, we consider planned lead times. In this paper we concentrate on th...

متن کامل

Lead Time Options in Supply Chain

We study lead time options in a manufacturer and a retailer supply chain where the retailer uses the (R, Q) inventory policy: the retailer places an order to the manufacturer who initially promises to deliver the order a lead time later. The manufacturer also promises to expedite or postpone the delivery of the order by a certain amount of time if the retailer makes such a request. Consequently...

متن کامل

Supply Chain Coordination through Lead Time Crashing in a Socially Responsible Supply Chain Considering Transportation Modes and Carbon Emissions Tax

In this paper, a socially responsible supply chain consisting of one supplier and one retailer is proposed. The supplier decides on replenishment cycle multiplier and the retailer invests in corporate social responsibility (CSR) and decides on the order-up-to-level under a periodic review replenishment policy. The retailer’s decisions impact on the supplier’s probability as well as the supply c...

متن کامل

Integrated Inventory Model with Controllable Lead Time Involving Investment for Quality Improvement in Supply Chain System

The purpose of this article is to investigate a two-echelon supply chain inventory problem consisting of a single-vendor and a single-buyer with controllable lead time and investment for quality improvements. This paper presents an integrated vendor-buyer inventory model in order to minimize the sum of the ordering cost, holding cost, setup cost, investment for quality improvement and crashing ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: OR Spectrum

سال: 2011

ISSN: 0171-6468,1436-6304

DOI: 10.1007/s00291-011-0267-y