Legionella-Associated Lung Abscess: Critical Pathogen or Minor Isolate?

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Legionella micdadei brain abscess.

We describe an immunocompromised patient who developed a large frontal brain abscess caused by Legionella micdadei. This is, to our knowledge, a rare case of culture-proven Legionella central nervous system infection.

متن کامل

Genome Sequence of an Environmental Isolate of the Bacterial Pathogen Legionella pneumophila

We report here the genomic sequence of Legionella pneumophila strain LPE509 from the water distribution system of a hospital in Shanghai, China. This is the first complete genome sequence of an environmental L. pneumophila isolate. Genomic analyses identified approximately 600 genes unique to LPE509 compared to those of the 7 available L. pneumophila genomes.

متن کامل

Abscess and empyema caused by Legionella micdadei.

Legionella micdadei is the second most common species implicated in the occurrence of Legionella pneumonia (D. J. Bremer, Semin. Respir. Infect. 4:190-205, 1987). Although there has been a reported lung abscess caused by dual infection (L. micdadei and L. pneumophila), there are no known cases of L. micdadei as the only causative organism. We report a case of a patient with a lung abscess from ...

متن کامل

Community-acquired lung abscess caused by Legionella micdadei in a myeloma patient receiving thalidomide treatment.

Legionella infection causes 2 to 14% of community-acquired pneumonia (CAP). Legionella micdadei constitutes <1% of these infections. We describe a case of cavitary L. micdadei CAP in a myeloma patient receiving thalidomide treatment. The importance of considering pneumonia and problems in diagnosing pneumonia caused by L. micdadei in this patient population are reviewed.

متن کامل

Lung Abscess

Introduction.?There are many points in the aetiology and treatment of lung abscess that are still not fully understood. Hence, the writer decided to.study the records of the cases of lung abscess admitted and treated at the Kin? Edward VII Memorial Hospital, Parel. The material consists of fifty consecutive clinic*1' cases of lung abscess. Hippocrates thought that lung abscess was caused by inh...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Canadian Journal of Infectious Diseases

سال: 1992

ISSN: 1180-2332

DOI: 10.1155/1992/985398