Local search for nonpreemptive multi-mode resource-constrained project scheduling

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Local search for nonpreemptive multi-mode resource-constrained project scheduling

This paper addresses a general class of nonpreemptive resource-constrained project scheduling problems in which activity durations are discrete functions of committed renewable and nonrenewable resources. We provide a well known 0±1 problem formulation and stress the importance of themodel by giving applications within production and operationsmanagement. Furthermore, we prove that the feasibil...

متن کامل

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

متن کامل

the combinatorial multi-mode resource constrained multi-project scheduling problem

this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...

متن کامل

A simple stochastic local search for multi-mode resource-constrained multi-project scheduling

In the multi-mode resource-constrained multi-project scheduling (MMRCMPSP) problem we have to find execution modes and starting times for the jobs of multiple projects, such that the total project delay is minimized. The delay of a project is the difference between its makespan and a lower bound on its duration. A secondary objective is to minimize the total makespan of all projects. The jobs o...

متن کامل

Hybrid Local Search for The Multi-Mode Resource-Constrained Multi-Project Scheduling Problem

In this work we present a multi-neighborhood, parallel local search approach for the Multi-Mode Resource-Constrained Multi-Project Scheduling Problem (MMRCMPSP). The search in multiple neighborhoods is conducted in parallel with dynamic load balancing among processors. Our solver works with an indirect solution representation and navigates through space of the feasible solutions by combining he...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IIE Transactions

سال: 1997

ISSN: 0740-817X,1545-8830

DOI: 10.1080/07408179708966417