Long-lead probabilistic forecasting of streamflow using ocean-atmospheric and hydrological predictors

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Forecasting of Lower Colorado River Basin Streamflow using Pacific Ocean Sea Surface Temperatures and ENSO

The lower Colorado River basin is located in an area of known El Niño-Southern Oscillation (ENSO) influence. A streamflow forecast is developed using Pacific Ocean Sea Surface Temperatures (SSTs) as predictors in addition to a traditional ENSO predictor, such as the Southern Oscillation Index (SOI). Significant regions of SST influence on streamflow were determined using linear correlations (LC...

متن کامل

Multivariate streamflow forecasting using independent component analysis

[1] Seasonal forecasting of streamflow provides many benefits to society, by improving our ability to plan and adapt to changing water supplies. A common approach to developing these forecasts is to use statistical methods that link a set of predictors representing climate state as it relates to historical streamflow, and then using this model to project streamflow one or more seasons in advanc...

متن کامل

Monthly streamflow forecasting using Gaussian Process Regression

Bureau of Economic Geology, Jackson School of Geosciences, University of Texas Austin, Austin, TX 78713, United States Department of Civil, Environmental, and Construction Engineering, University of Central Florida, Orlando, FL 32816, United States Key Laboratory for Agro-Ecological Processes in Subtropical Region, Institute of Subtropical, Agriculture, Chinese Academy of Sciences, Changsha, Ch...

متن کامل

Neural network streamflow forecasting

Classification of heterogeneous precipitation fields for the assessment and possible improvement of lumped neural network models for streamflow forecasts N. Lauzon, F. Anctil, and C. W. Baxter Golder Associates, Calgary, Canada Département de génie civil, Pavillon Pouliot, Université Laval, Québec, G1K 7P4, Canada HYDRANNT Consulting Inc., Port Coquitlam, Canada Received: 20 December 2005 – Acc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Water Resources Research

سال: 2006

ISSN: 0043-1397

DOI: 10.1029/2004wr003853