Long-lead probabilistic forecasting of streamflow using ocean-atmospheric and hydrological predictors
نویسندگان
چکیده
منابع مشابه
Long lead-time streamflow forecasting of the North Platte River incorporating oceanic–atmospheric climate variability
متن کامل
Forecasting of Lower Colorado River Basin Streamflow using Pacific Ocean Sea Surface Temperatures and ENSO
The lower Colorado River basin is located in an area of known El Niño-Southern Oscillation (ENSO) influence. A streamflow forecast is developed using Pacific Ocean Sea Surface Temperatures (SSTs) as predictors in addition to a traditional ENSO predictor, such as the Southern Oscillation Index (SOI). Significant regions of SST influence on streamflow were determined using linear correlations (LC...
متن کاملMultivariate streamflow forecasting using independent component analysis
[1] Seasonal forecasting of streamflow provides many benefits to society, by improving our ability to plan and adapt to changing water supplies. A common approach to developing these forecasts is to use statistical methods that link a set of predictors representing climate state as it relates to historical streamflow, and then using this model to project streamflow one or more seasons in advanc...
متن کاملMonthly streamflow forecasting using Gaussian Process Regression
Bureau of Economic Geology, Jackson School of Geosciences, University of Texas Austin, Austin, TX 78713, United States Department of Civil, Environmental, and Construction Engineering, University of Central Florida, Orlando, FL 32816, United States Key Laboratory for Agro-Ecological Processes in Subtropical Region, Institute of Subtropical, Agriculture, Chinese Academy of Sciences, Changsha, Ch...
متن کاملNeural network streamflow forecasting
Classification of heterogeneous precipitation fields for the assessment and possible improvement of lumped neural network models for streamflow forecasts N. Lauzon, F. Anctil, and C. W. Baxter Golder Associates, Calgary, Canada Département de génie civil, Pavillon Pouliot, Université Laval, Québec, G1K 7P4, Canada HYDRANNT Consulting Inc., Port Coquitlam, Canada Received: 20 December 2005 – Acc...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Water Resources Research
سال: 2006
ISSN: 0043-1397
DOI: 10.1029/2004wr003853