Long-term production scheduling of open pit mines using particle swarm and bat algorithms under grade uncertainty

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty

It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...

متن کامل

Managing risk and waste mining in long-term production scheduling of open-pit mines

Open pit mine design and production scheduling deals with the quest for the most profitable mining sequence over the life of a mine. The dynamics of mining ore and waste and the spatial grade uncertainty make predictions of the optimal mining sequence a challenging task. A new optimization approach to production scheduling based on the effective management of waste mining and orebody grade unce...

متن کامل

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

Risk Averse Approaches in Open-pit Production Planning under Ore Grade Uncertainty: a Ultimate Pit Study

During early phases of open-pit mining production planning many parameters are uncertain, and since the mining operation is performed only once, any evaluations based only on on average outcomes neglects the very real chance of obtaining an outcome that is below average. Taking into account also that operation costs are considerable and the mining horizon usually extends over several decades it...

متن کامل

Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines

We present a methodology for long-term mine planning based on a general capacitated multicommodity network flow formulation. It considers underground and open-pit ore deposits sharing multiple downstream processing plants over a long horizon. The purpose of the model is to optimize several mines in an integrated fashion, but real size instances are hard to solve due to the combinatorial nature ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Southern African Institute of Mining and Metallurgy

سال: 2018

ISSN: 2225-6253,2411-9717

DOI: 10.17159/2411-9717/2018/v118n4a5