M-machine, no-wait flowshop scheduling with sequence dependent setup times and truncated learning function to minimize the makespan
نویسندگان
چکیده
منابع مشابه
Lot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors
This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملSolving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...
متن کاملThe No-wait Flowshop Problem with Sequence Dependent Setup times and Release Dates
Population based metaheuristics, such as hybrid genetic algorithms or memetic algorithms, play an important role in the solution of combinatorial optimization problems. The memetic algorithm presented here for the no-wait flowshop scheduling problem addresses a hierarchically organized complete ternary tree to represent the population that putted together with a recombination plan resembles a p...
متن کاملsolving group scheduling problem in no-wait flow shop with sequence dependent setup times
different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. conventional productionmethods are constantly subs...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Industrial Engineering Computations
سال: 2016
ISSN: 1923-2926,1923-2934
DOI: 10.5267/j.ijiec.2015.9.004