Manufacturing Analytics for problem-solving processes in production
نویسندگان
چکیده
منابع مشابه
the algorithm for solving the inverse numerical range problem
برد عددی ماتریس مربعی a را با w(a) نشان داده و به این صورت تعریف می کنیم w(a)={x8ax:x ?s1} ، که در آن s1 گوی واحد است. در سال 2009، راسل کاردن مساله برد عددی معکوس را به این صورت مطرح کرده است : برای نقطه z?w(a)، بردار x?s1 را به گونه ای می یابیم که z=x*ax، در این پایان نامه ، الگوریتمی برای حل مساله برد عددی معکوس ارانه می دهیم.
15 صفحه اولAdvanced Manufacturing Analytics – Data-Driven Optimization of Manufacturing Processes
Traditional concepts for manufacturing process optimization, e.g., Lean Production and Total Quality Management, represent management-driven and experience-based approaches. The increasing use of cyber-physical systems as well as the digitalization of manufacturing operations management by manufacturing execution systems (MES) lead to enormous amounts of structured and unstructured manufacturin...
متن کاملImproved Methods for Production Manufacturing Processes in Environmentally Benign Manufacturing
How to design a production process with low carbon emissions and low environmental impact as well as high manufacturing performance is a key factor in the success of low-carbon production. It is important to address concerns about climate change for the large carbon emission source manufacturing industries because of their high energy consumption and environmental impact during the manufacturin...
متن کاملEvolutionary approach for solving cell-formation problem in cell manufacturing
New environmental characteristics and requirements have challenged manufacturing enterprises to improve the efficiency and productivity of their production activities. Cellular manufacturing (CM) as one of the solutions to this problem, as implementation of Group technology (GT), was proposed. Performance of cellular manufacturing systems depends heavily on the cell structure. In this paper we ...
متن کاملAn imperialist competitive algorithm for solving the production scheduling problem in open pit mine
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Procedia CIRP
سال: 2019
ISSN: 2212-8271
DOI: 10.1016/j.procir.2019.03.001