Material and capacity requirements planning with dynamic lead times
نویسندگان
چکیده
منابع مشابه
Material Requirement Planning under Fuzzy Lead Times
This paper proposes a fuzzy multi-objective integer linear programming approach to model a material requirement planning (MRP) problem with fuzzy lead times. We incorporate to the crisp MRP model the possibility of occurrence of each one of the possible lead times. Then, an objective function that maximizes the possibility of occurrence of the lead times is considered. By combining this objecti...
متن کاملIntegrated capacity and inventory management with capacity acquisition lead times
In this paper we consider a make-to-stock production system whose permanent production capacity can be increased temporarily by making use of some contingent resources, while this capacity acquisition has a constant lead time associated with it. We present a model where the capacity management problem is handled in an integrated manner with the inventory management, under non-stationary and sto...
متن کاملA multiple objective approach for joint ordering and pricing planning problem with stochastic lead times
The integration of marketing and demand with logistics and inventories (supply side of companies) may cause multiple improvements; it can revolutionize the management of the revenue of rental companies, hotels, and airlines. In this paper, we develop a multi-objective pricing-inventory model for a retailer. Maximizing the retailer's profit and the service level are the objectives, and shorta...
متن کاملCapacity Expansion with Lead Times and Correlated Random Demand
The combination of uncertain demand and lead times for installing capacity creates the risk of shortage during the lead time, which may have serious consequences for a service provider with dependent customers. This paper analyzes a model of capacity expansion with correlated random demand and a fixed lead time for adding capacity. We develop and prove the form of an optimal policy for expansio...
متن کاملCapacity Expansion with Lead Times and Autocorrelated Random Demand
The combination of uncertain demand and lead times for installing capacity creates the risk of shortage during the lead time, which may have serious consequences for a service provider with dependent customers. This paper analyzes a model of capacity expansion with autocorrelated random demand and a fixed lead time for adding capacity. To provide a specified level of service, a discrete time ex...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Production Research
سال: 2012
ISSN: 0020-7543,1366-588X
DOI: 10.1080/00207543.2011.603707