Mempercepat Waktu Pelaksanaan Proyek Pembangunan Jalur Ganda Kereta Api Antara Mojokerto-Sepanjang Melalui Penjadwalan Line of Balance

نویسندگان

چکیده

In construction management, project scheduling is an important thing to note. The schedule a means of determining proper duration, controlling implementation progress, and allocating resources efficiently. Improper will have impact on delays. the for double track railway across south Java between Mojokerto-Sepanjang planned be completed in 60 weeks with overlapping activities due changes activities. This rail ongoing project. research aims find out time using Line Balance. development has length 3011.23 m. Balance method carried by dependency logic, preparing Of schedule, drawing graph, production speed. results study show that line balance existing conditions lines intersection jobs. indicates there work. For this reason, improvements are made changing logic from work was originally parallel not parallel. reducing duration per cycle 1 week revealed could accelerated 38 weeks. So can used speed up

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Cytotoxic effect of γ-sitosterol from Kejibeling (Strobilanthes crispus) and its mechanism of action towards c-myc gene expression and apoptotic pathway

Metode: Penelitian in vitro ini menggunakan kultur sel kanker kolon manusia (Caco-2), sel kanker hepar manusia (HepG2), sel kanker payudara tergantung hormon (MCF7) dan kultur sel normal hepar manusia (Chang Liver). Efek sitotoksik diukur melalui uji MTT melalui penentuan kadar yang membunuh 50% sel (IC50). Mekanisme sitotoksik dipelajari dengan menentukan pengaruh penambahan γ-sitosterol pada ...

متن کامل

Interpersonal Conflict and Its Management in Information System Development

Information System Development (ISD) merupakan area yang memiliki banyak gejala konflik, antara lain permusuhan dan kecemburuan, kurangnya komunikasi, berkembangnya aturan, norma, rendahnya moral dan adanya frustasi. Hanya sedikit dari studi ISD yang telah mempelajari konflik interpersonal, manajemen dari konflik tersebut dan dampak dari konflik terhadap hasil proyek. Tiap individu memilih jeni...

متن کامل

Agile monitoring using the line of balance

There is a need to collect, measure, and present progress information in all projects, and Agile projects are no exception. In this article, the authors show how the Line of Balance, a relatively obscure indicator, can be used to gain insights into the progress of projects not provided by burn down charts or cumulative flow diagrams, two of the most common indicators used to track and report pr...

متن کامل

Quality Estimation of Assembly Line Balance

In the paper authors discuss the quality estimation of assembly line balancing problem. Task are assigned to workstations and the calculated measures show the quality of the final results. Because even optimal solutions contain idle times, the estimation of quality of end results is very important. In the literature we can find different measures but the most useful are: line efficiency, smooth...

متن کامل

A Nondestructive Testing Research Based on Metal Bumper Bar System Inspired by Guided-wave

Abstrak Selama uji tak rusak untuk sistem bar bumper logam, itu adalah masalah kritis yang tidak dapat mengidentifikasi gelombang yang dipantulkan. Berdasarkan inspirasi gelombang-terpandu dan melalui banyak pembelajaran simulasi, makalah ini secara sistematis menganalisis keadaan uji mutu untuk sistem bar bumper logam pada empat aspek berikut: wilayah, waktu, lebar kepala-gelombang dan laju ya...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Jurnal Manajemen Teknologi dan Teknik Sipil

سال: 2023

ISSN: ['2621-7686']

DOI: https://doi.org/10.30737/jurmateks.v5i2.4020