Merit rating and formula‐based resource allocation
نویسندگان
چکیده
منابع مشابه
Merit Rating for Doctor Professional Liability Insurance
Merit rating is the use of the insured's actual claim experience to predict future claim experience. This paper discusses merit rating for professional liability insurance for both individual doctors and group practices. The paper presents several different theoretical formulations for merit rating. Credibilities are stated in terms of the parameters of the risk process. The paper discusses sev...
متن کاملCollaborative Rating Allocation
This paper studies the collaborative rating allocation problem, in which each user has limited ratings on all items. These users are termed “energy limited”. Different from existing methods which treat each rating independently, we investigate the geometric properties of a user’s rating vector, and design a matrix completion method on the simplex. In this method, a user’s rating vector is estim...
متن کاملThe Allocation of Merit Pay in Academia
This paper investigates whether the widespread awarding of faculty merit pay at a large public university accurately reflects productivity. We show that pairwise voting on a quality standard by a committee can in theory be consistent with observed allocation patterns. However, the data indicate only nominal adherence to a quality standard. Departments with more severe compression issues are mor...
متن کاملEconomic and Effectiveness Evaluation Analysis of Some Resource Allocation Procedures
Review of theoretical models for cost-effectiveness and of procedures currently being used by different levels of decision makers to evaluate the projects or alternatives is the main objective of this article. To come to some conclusion that which theoretical model would be more effective to be applied for allocating the limited resources among different projects. the performance evaluation pro...
متن کاملBicriteria Resource Allocation Problem in Pert Networks
We develop a bicriteria model for the resource allocation problem in PERT networks, in which the total direct costs of the project as the first objective, and the mean of project completion time as the second objective are minimized. The activity durations are assumed to be independent random variables with either exponential or Erlang distributions, in which the mean of each activity duration ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Educational Management
سال: 2000
ISSN: 0951-354X
DOI: 10.1108/09513540010322366