Microfinance Risk Management with Work Breakdown Structure
نویسندگان
چکیده
منابع مشابه
The work breakdown structure in software project management
The work breakdown structure (WBS) is a vehicle for breaking an engineering project down into subproject, tasks, subtasks, work packages, and so on. It is an important planning tool which links objectives with resources and activities in a logical framework. It becomes an important status monitor during the actual implementation as the completions of subtasks are measured against the project pl...
متن کاملProject Management System Based on Work-Breakdown-Structure Process Model
We have developed a “WBS(Work Breakdown Structure) process model” for a business application software development project. We have also developed a project management system called “PRO-NAVI” which works on the “WBS process model.” This WBS process model” provides (1) mutual mapping between the “software development processes”, “activities”, “products”, “know-how,” “rules”, and “standards”, and...
متن کاملIntegrating Process and Work Breakdown Structure with Design Structure Matrix
∗Department of Computer Science and Information Engineering, National Central University, Jhongli, Taiwan E-mail: {yjlee, jass, wtlee, jielee}@selab.csie.ncu.edu.tw ∗∗Department of Computer and Information Science, National Taichung University, Taichung, Taiwan E-mail: [email protected] ∗∗∗Department of Computer Science and Engineering, National Taiwan Ocean University, Keelung, Taiwan E-m...
متن کاملMicrofinance and Risk Management: A Client Perspective
To design successful products, the first step entails understanding the financial needs of clients (and potential clients) and how financial services fit into their money management strategies. Understanding clients requires an awareness of the economic goals of poor households, how people manage resources and activities, and how they deal with risk in their dayto-day lives. Such a framework ca...
متن کاملWork breakdown structure (WBS) development for underground construction
a r t i c l e i n f o A work breakdown structure (WBS) can prove to be pivotal to successful project management planning. There are few published studies about the methodologies or tools to develop the appropriate WBS for a project, and those that are available are limited to the specific areas of construction such as apartment-building construction and boiler manufacturing. This research has a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Financial Risk Management
سال: 2012
ISSN: 2167-9533,2167-9541
DOI: 10.4236/jfrm.2012.13007