Minimal-change order and separability in linear codes
نویسندگان
چکیده
منابع مشابه
Minimal-change order and separability in linear codes
A linear code E? is said to he in minimal-change order if each codeword differs from its predecessor by a word of minimum weight. A rule is presented to construct such an order in case that i? has a basis of codewords with minimum weight. Some consequences concem-ing the ranking and separability in 5 F are mentioned. It is well known that the set of all binary words of length n can be ordered i...
متن کاملOn Minimal and Almost-Minimal Linear Codes
Minimal linear codes are such that the support of every codeword does not contain the support of another linearly independent codeword. Such codes have applications in cryptography, e.g. to secret sharing and secure two-party computations. We pursue here the study of minimal codes and construct infinite families with asymptotically non-zero rates. We also introduce a relaxation to almost minima...
متن کاملVariations on Minimal Linear Codes
Minimal linear codes are linear codes such that the support of every codeword does not contain the support of another linearly independent codeword. Such codes have applications in cryptography, e.g. to secret sharing. We pursue here their study and construct asymptotically good families of minimal linear codes. We also push further the study of quasi-minimal and almost-minimal linear codes, re...
متن کاملBounds on Minimal Codewords in Linear Codes
The notion of minimal codewords in linear codes was introduced recently by Massey. In this paper two weight bounds on minimal code-words are proved; an upper bound above which no codewords are minimal and a lower bound below which all codewords are minimal. It is shown for Hamming codes that every weight class between the two bounds contains at least one minimal codeword and at least one non-mi...
متن کاملMinimal Linear Codes over Finite Fields
As a special class of linear codes, minimal linear codes have important applications in secret sharing and secure two-party computation. Constructing minimal linear codes with new and desirable parameters has been an interesting research topic in coding theory and cryptography. Ashikhmin and Barg showed that wmin/wmax > (q− 1)/q is a sufficient condition for a linear code over the finite field ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Information Theory
سال: 1993
ISSN: 0018-9448
DOI: 10.1109/18.265509