Minimizing mean flow time with release time constraint

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing Average Flow-Time under Knapsack Constraint

We give the first logarithmic approximation for minimizing average flow-time of jobs in the subset parallel machine setting (also called the restricted assignment setting) under a single knapsack constraint. In a knapsack constraint setting, each job has a profit, and the set of jobs which get scheduled must have a total profit of at least a quantity Π. Our result extends the work of Gupta, Kri...

متن کامل

Minimizing total flow time in single machine environment with release time: an experimental analysis

We study the problem of minimizing total flow time on a single machine with job release times. This problem is NP-complete for which is no constant ratio approximation algorithm. Our objective is to study experimentally how well, on average, the problem can be solved. The algorithm we use produces non-preemptive schedules converted from preemptive ones. We evaluate average solution quality for ...

متن کامل

A New Branch-and-Bound for the Problem of Mean Completion Time for the Single Machine with Release Time

Preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. In this paper, the same problem has been considered in which objective is to minimize the mean flow time. To prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. O...

متن کامل

Truck scheduling problem in a cross-docking system with release time constraint

In a supply chain, cross-docking is one of the most innovative systems for ameliorating the operational performance at distribution centers. Cross-docking is a logistics strategy in which freight is unloaded from inbound trucks and (almost) directly loaded into outbound trucks, with little or no storage in between, thus no inventory remains at the distribution center. In this study, we consider...

متن کامل

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

[if gte mso 9]> The purpose of this paper is to consider the problem of scheduling a set of start time-dependent jobs in a two-machine flow shop, in which the actual processing times of jobs increase linearly according to their starting time. The objective of this problem is to minimize the makespan. The problem is known to be NP-hardness[ah1] ; therefore, there is no polynomial-time algorithm...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Theoretical Computer Science

سال: 1990

ISSN: 0304-3975

DOI: 10.1016/0304-3975(90)90100-v