Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound

In this paper we study an extension of the classical Resource-Constrained Project Scheduling Problem (RCPSP) with minimum makespan objective by introducing a further type of precedence constraints denoted as “Feeding Precedences” (FP). This kind of problem happens in that production planning environment, like make-to-order manufacturing, when the effort associated with the execution of an activ...

متن کامل

A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations

In this paper we propose a new lower bound for the resource constrained project scheduling problem with generalized precedence relationships. The lower bound is based on a relaxation of the resource constraints among independent activities and on a solution of the relaxed problem suitably represented by means of an AON acyclic network. Computational results are presented and confirmed a better ...

متن کامل

A Time-Oriented Branch-and-Bound Algorithm for Resource- Constrained Project Scheduling with Generalised Precedence Constraints

Resource-constrained project scheduling with generalised precedence constraints is a very general scheduling model with applications in areas such as make-to-order production planning. We describe a time-oriented branch-and-bound algorithm that uses constraint-propagation techniques which actively exploit the temporal and resource constraints of the problem in order to reduce the search space. ...

متن کامل

A New Lower Bound for Completion Time Distribution Function of Stochastic PERT Networks

In this paper, a new method for developing a lower bound on exact completion time distribution function of stochastic PERT networks is provided that is based on simplifying the structure of this type of network. The designed mechanism simplifies network structure by arc duplication so that network distribution function can be calculated only with convolution and multiplication. The selection of...

متن کامل

A New Lower Bound for Completion Time Distribution Function of Stochastic PERT Networks

In this paper, a new method for developing a lower bound on exact completion time distribution function of stochastic PERT networks is provided that is based on simplifying the structure of this type of network. The designed mechanism simplifies network structure by arc duplication so that network distribution function can be calculated only with convolution and multiplication. The selection of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: 4OR

سال: 2011

ISSN: 1619-4500,1614-2411

DOI: 10.1007/s10288-011-0168-6