Minimizing the number of tardy jobs with precedence constraints and agreeable due dates

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the Expected Number of Tardy Jobs in Dynamic Flow Shop with Stochastic Due Dates

The problem of minimizing the expected number of tardy jobs in a dynamic m machine flow shop i.e., Fm�rj�E�∑Uj� is studied in this research. It is assumed that the jobs with deterministic processing times and stochastic due dates arrive dynamically and randomly to the flow shop cell. The due date of each job is assumed to be normally distributed with known mean and variance. A dynamic method is...

متن کامل

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

Minimizing the Number of Tardy Jobs with Chance Constraints and Linearly Associated Stochastically Ordered Processing Times

We consider the single-machine sequencing model with stochastic processing times and the problem of minimizing the number of stochastically tardy jobs. In general, this problem is NP-hard. Recently, however, van den Akker and Hoogeveen found some special cases that could be solved in polynomial time. We generalize their findings by providing a polynomial solution for any stochastically ordered ...

متن کامل

Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries

In this paper, an integrated due date assignment, and delivery scheduling of order for multi customer for make to order production system in supply chain has been survered. One manufacture received n orders from K customers. The due date of orders for each customer is common and manufacture can assign the due dates with a related cost. Orders must be process by one machine and send to customers...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Discrete Applied Mathematics

سال: 1997

ISSN: 0166-218X

DOI: 10.1016/s0166-218x(96)00043-1