Minimizing the Total Completion Time and Total Earliness Time Functions for a Machine Scheduling Problem Using Local Search Methods

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Online heuristic for the preemptive single machine scheduling problem of minimizing the total weighted completion time

1Laboratory of Algorithms and Technologies for Networks Analysis National Research University Higher School of Economics 136 Rodionova street, Niznhy Novgorod 603093, Russia 2Department of Industrial and Systems Engineering, University of Florida 303 Weil Hall, Gainesville, FL, 32611, USA 3Department of Operations Management & Operations Research, University of Groningen Nettelbosje 2, 9747 AE ...

متن کامل

Public transport fleet scheduling for minimizing total transfer waiting time

Public transportation has been one of the most important research fields in the two last decades. The purpose of this paper is to create a schedule for public transport fleets such as buses and metro trains with the goal of minimizing the total transfer waiting time. We extend previous research works in the field of transit schedule with considering headways of each route as decision variables....

متن کامل

Minimizing the Total Completion Time in a Two-Machine Group Scheduling Problem with Carryover Sequence Dependency

The two-machine group-scheduling problem for minimizing the total completion time with carryover sequence dependency is addressed in this paper. These problems are typically encountered in electronics manufacturing. A procedure called Minsetup is developed to determine the lower bound for the total completion time, and a search algorithm based on tabu search is proposed to solve the problem. Un...

متن کامل

A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time

Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Iraqi Journal of Science

سال: 2020

ISSN: 2312-1637,0067-2904

DOI: 10.24996/ijs.2020.si.1.17