Minimizing the total tardiness for the tool change scheduling problem on parallel machines
نویسندگان
چکیده
منابع مشابه
minimizing the sum of maximum earliness and tardiness on identical parallel machines scheduling problem
this paper addresses the problem of minimizing the sum of maximum earliness and tardiness on identical parallel machines scheduling problem. each job has a processing time and a due date. since this problem is trying to minimize and diminish the values of earliness and tardiness, the results can be useful for just–in-time production systems. it is shown that the problem is np-hard. using effici...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flowtime through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters with it, this is why in recent decades extensive researches have been done on scheduling issues. A type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical ...
متن کاملMinimizing total tardiness on parallel machines with preemptions
In this note, we correct a mistake which was made in the paper “Minimizing Total Tardiness on Parallel Machines with Preemptions’ (see Journal of Scheduling, Vol. 15, 2012, 193 200).
متن کاملfuzzy programming for parallel machines scheduling: minimizing weighted tardiness/earliness and flow time through genetic algorithm
appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. one type of scheduling problems is just-in-time (jit) scheduling and in this area, motivated by jit manufacturing, this study investigates a mathematical model for...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Industrial Engineering Computations
سال: 2016
ISSN: 1923-2926,1923-2934
DOI: 10.5267/j.ijiec.2015.10.002