Minimizing total completion time for re-entrant flow shop scheduling problems
نویسندگان
چکیده
منابع مشابه
Solving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملA Two-Phase Constructive Heuristic for Permutation Flow-Shop Scheduling Problem Minimizing Total Completion Time
This paper describes a polynomial-time heuristic for the permutation flow-shop scheduling problem with the criterion of minimizing total completion time. The proposed method consists of two phases: arranging the jobs in priority order and then constructing a sequence. A new ranking method is employed to prioritize the jobs for incorporating into the construction phase of the heuristic. Computat...
متن کاملA Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
متن کاملDesign of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
This paper presents a simulated genetic algorithm (GA) model of scheduling the flow shop problem with reentrant jobs. The objective of this research is to minimize the weighted tardiness and makespan. The proposed model considers that the jobs with non-identical due dates are processed on the machines in the same order. Furthermore, the re-entrant jobs are stochastic as only some jobs are requi...
متن کاملA Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Theoretical Computer Science
سال: 2011
ISSN: 0304-3975
DOI: 10.1016/j.tcs.2011.08.030