Mixed Integer Linear Programs for Blocking and No Wait Job Shop Scheduling Problems in Robotic cells

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Mixed Integer Linear Programs for Blocking and No Wait Job Shop Scheduling Problems in Robotic cells

This paper studies the problem of scheduling Job shops in robotic cells with no intermediate buffers, called No Wait Blocking Transport Job Shop Scheduling Problem (NWBT JSSP). This problem is an extension of the classical job shop problem. No Wait Blocking Transport job shop problems arise in many realistic production environments. To tackle this problem, we developed a Mixed Integer Linear Pr...

متن کامل

Mixed Integer Linear Programs for Blocking and No Wait Job Shop Scheduling Problems in Robotic cells

This paper studies the problem of scheduling Job shops in robotic cells with no intermediate buffers, called No Wait Blocking Transport Job Shop Scheduling Problem (NWBT JSSP). This problem is an extension of the classical job shop problem. No Wait Blocking Transport job shop problems arise in many realistic production environments. To tackle this problem, we developed a Mixed Integer Linear Pr...

متن کامل

Scheduling Trains with Priorities: A No-Wait Blocking Parallel-Machine Job-Shop Scheduling Model

The paper investigates train scheduling problems when prioritised trains and non-prioritised trains are simultaneously traversed in a single-line rail network. In this case, no-wait conditions arise because the prioritised trains such as express passenger trains should traverse continuously without any interruption. In comparison, non-prioritised trains such as freight trains are allowed to ent...

متن کامل

Comparing Mixed-Integer and Constraint Programming for the No-Wait Flow Shop Problem with Due Date Constraints

The impetus for this research was examining a flow shop problem in which tasks were expected to be successively carried out with no time interval (i.e., no wait time) between them. For this reason, they should be completed by specific dates or deadlines. In this regard, the efficiency of the models was evaluated based on makespan. To solve the NP-Hard problem, we developed two mathematical mode...

متن کامل

A hybrid genetic algorithm for no-wait job shop scheduling problems

A no-wait job shop (NWJS) describes a situation where every job has its own processing sequence with the constraint that no waiting time is allowed between operations within any job. A NWJS problem with the objective of minimizing total completion time is a NP-hard problem and this paper proposes a hybrid genetic algorithm (HGA) to solve this complex problem. A genetic operation is defined by c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Computer Applications

سال: 2016

ISSN: 0975-8887

DOI: 10.5120/ijca2016912158