Modeling and Solving Flow Shop Scheduling Problem Considering Worker Resource

نویسندگان

چکیده

In this paper, an uninterrupted hybrid flow scheduling problem is modeled under uncertainty conditions. Due to the of processing time in workshops, fuzzy programming method has been used control parameters and preparation time. proposed model, there are several jobs that must be processed by machines workers, respectively. The main purpose model determine correct sequence operations assign each machine worker at stage, so total completion (Cmax) minimized. Also for unspecified parameter from GAMS software solve sample problems. results solving small medium dimensions show with increasing uncertainty, amount consequently increases. Increases whole work. On other hand, increase number workers stage due high efficiency machines, all works decreased. Innovations paper include storage respect addition payment allocation another innovation article.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Re-entrant No-wait Flow Shop Scheduling Problem

In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...

متن کامل

Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All ...

متن کامل

Integrated modeling and solving the resource allocation problem and task scheduling in the cloud computing environment

Cloud computing is considered to be a new service provider technology for users and businesses. However, the cloud environment is facing a number of challenges. Resource allocation in a way that is optimum for users and cloud providers is difficult because of lack of data sharing between them. On the other hand, job scheduling is a basic issue and at the same time a big challenge in reaching hi...

متن کامل

Solving the continuous flow-shop scheduling problem by metaheuristics

Continuous flow-shop scheduling problems circumscribe an important class of sequencing problems in the field of production planning. The problem considered here is to find a permutation of jobs to be processed sequentially on a number of machines under the restriction that the processing of each job has to be continuous with respect to the objective of minimizing the total processing time (flow...

متن کامل

Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Innovation in Engineering

سال: 2021

ISSN: ['2783-1906']

DOI: https://doi.org/10.59615/ijie.1.4.1